Specialists completed advanced training on ‘In-Laboratory Quality Control of Measurements in Laboratories’
News
The Laboratory's instruments were supplemented with a DFS-462 spectrometer.
Specialists successfully completed training in the operation of this device.
Geoplazma LLP continues studying of earlier lost and written-off, as well as substandard reserves of chrome ore of poor quality in ‘Millionny and Obyedinenny’ dumps under the contract with ERG Recycling LLP.
Geoplazma LLP celebrates 15th anniversary.
Geoplazma LLP is involved in studies of earlier lost and written-off and substandard low-grade chromium ore reserves from DGOK dumps (the Donskoy Ore Mining and Processing Plant) for the purpose of their use in mining and processing under the Contract signed with ERG Recycling LLP. The works are carried out at the Millionny and Obyedinenny ore dumps, which are no longer in operation. It is planned to extract at least 50,000 ton of substandard ores.
The specialists had advance training in Instrumental Analytical Methods. Nuclear Emission, Nuclear Absorption Spectrometry. X-ray fluorescence and received their certificates.
Geoplazma LLP specialists took their part in the Seminar on preparation and advance training of the employees in the sphere of technical regulation, metrology and management systems organized by KazInSt Republican State Enterprise.
Geoplazma LLP Laboratory started inter-laboratory (external) control of geological materials sampled at the copper ores field in the Aktyubinskaya Oblast.
Geoplazma LLP specialists successfully developed the exploration plans for copper and gold containing ores in the Koskol area of the Kyzylorda Oblast and copper and porphyric ore in Soyuznoye area Aktyubinskaya Oblast. These design documents contain description of the geological and geophysical works within the areas with a complete calculation of the scope and costs. They shall include a Section for Environment Protection reflecting impact of prospecting works on environment.
Geoplazma LLP successfully developed the Design for recovery of earlier abandoned Kar-34 well in Karatobe structure, Zharkamys East block together with the Environmental Impact Assessment section.